A qualified engineer visits your site every week. Checks the work. Verifies materials. Sends you photos. Coordinates with your contractor. Catches problems before they become expensive. Peace of mind — on tap.
The single most common mistake homeowners make: they trust the contractor to self-supervise. He isn't going to. Not out of malice — but because his goal is finishing fast, not building well. That's why every serious project needs an independent, technical, client-side supervisor.
A qualified site engineer visits your site every week (or more often for critical stages). Verifies materials. Measures work done. Photographs everything. Sends you a written report. Coordinates with contractor on next-week priorities. Catches problems while they're still fixable.
A dedicated site engineer is assigned to your project — same person for the entire duration. You get their number; they get yours.
Three-way meeting at your site — you, us, contractor. We agree on quality standards, escalation protocol, weekly visit schedule and payment certification process.
Site engineer visits every week (or more often during critical stages). Uses a 40-point QC checklist. Verifies materials, measures work done, photographs progress.
Written report + photo log sent via WhatsApp/email. Progress vs plan, quality issues flagged, next-week priorities listed, contractor bill certified if due.
Any quality issue gets a formal note to contractor with a fix deadline. Repeat issues escalated to partners. Documented record protects you in disputes.
10–20 photos every visit — foundations, RCC, masonry, plaster, finishes documented as they happen.
Structured weekly report with QC checklist status, issues flagged, next-week priorities.
Contractor's monthly bill verified against actual work done — protects you from over-billing.
Every major material delivery inspected — cement grade, steel grade, tile dimensions, brand verification.
Your site engineer's number for questions between visits. Partner escalation available.
End-of-project report — punch list, defects to be rectified before final payment, warranty items.
Small residences typically billed per sft. Larger projects billed as % of estimated project cost (typically 2–3.5%). Fee paid monthly against site visits completed.
Get your feeTell us where your site is and what stage it's at. We'll come back with a supervision plan within 24 hours.